Pricing
Plans For Every Budget
Cost plan provided is indicative and will vary according to the design, site conditions and access and location.
Grey Construction
Best value- Grading and Site Preparation
- All Structure Materials
- Foundation Construction
- Framing
- Plastering
- All Labour
- Interior and Exterior Painting
- Aluminium Doors and Windows
- Flooring
- Rough and Finish Electrical
- Rough and Finish Plumbing
- Sanitary Wares
- Flush Doors and Wooden Front Door
- Installation of Septic System
- Landscaping
- Enclosure Wall and Front Gate
- Waterproofing
- Termite Treatment
Turn Key
Most Popular- Grading and Site Preparation
- All Structure Materials
- Foundation Construction
- Framing
- Plastering
- All Labour
- Interior and Exterior Painting
- Aluminium Doors and Windows
- Flooring
- Rough and Finish Electrical
- Rough and Finish Plumbing
- Sanitary Wares
- Flush Doors and Wooden Front Door
- Installation of Septic System
- Landscaping
- Enclosure Wall and Front Gate
- Waterproofing
- Termite Treatment
Premium Turn Key
Worry Free Solution- Grading and Site Preparation
- All Structure Materials
- Foundation Construction
- Framing
- Plastering
- All Labour
- Interior and Exterior Painting
- Aluminium Doors and Windows
- Flooring
- Rough and Finish Electrical
- Rough and Finish Plumbing
- Sanitary Wares
- Flush Doors and Wooden Front Door
- Installation of Septic System
- Landscaping
- Enclosure Wall and Front Gate
- Waterproofing
- Termite Treatment
What is included
All our plans include

Licensed & Reliable
We are a CIDB-registered company, ensuring professional standards and accountability for every project we undertake.

Quality Materials
Our plans include all materials required for the job. A budget list is in the contract for 100% transparency. We also provide a free container for storage.*

Contract of Service
When you hire us, we agree on all terms and conditions and write it down in your contract to protect all parties.

Skilled Workforce
Labour costs are included in the quoted price. Our teams are a mix of local and international talent, ensuring high-quality service while embracing global expertise.

Progress Report
You’ll receive a progress report to check if everything is on track. Benefit from our team’s skills, expertise and knowledge of the industry.

Health and Safety
We do regular Health and Safety site checks to ensure the safety of our teams and to avoid any damage to your property.
any questions ?
Frequently Asked Questions
Is your price higher than other contractors?
Is the price inclusive of VAT?
The above price per Sq. Ft. does not include VAT. The rate of VAT is 15%.
As a Licensed Contractor, we have an obligation to charge VAT on our Invoices. However, if you are eligible, you may claim up to Rs 300,000 of the VAT amount at the MRA. Find out more on how to claim VAT when building your home.
When you obtain a final quote from us, it will be inclusive of the VAT payable.
How and when are payments made?
All of this is laid down in your contract of service.
The instalment schedule will generally be as follows and will be as per the advancement of the works:
-
Advance Payment (Upon signature of Contract) : 10%
-
Completion of Preliminary Site Works : 10%
-
Completion of foundation up to surface bed level : 20%
-
Completion of blockwork, columns up to beam level : 20%
-
Completion of casting of roof slab : 20%
-
Completion of external rendering : 10%
-
Completion of internal rendering : 10%
We only accept cheque payments and bank transfers.
Can you guarantee that you will be staying within the defined time frame?
A reasonable time frame is defined in the contract of service which is signed by both parties. However, exterior factors such as weather conditions or delays in building materials deliveries can cause us to run a bit late on the schedule. When such exterior factors are not present, we deliver what we say, when we say!
Are pricing plans fixed?
Pricing plans are not fixed and will vary as per the project and the plans.
A specific budget will be provided per item and in case the budget is exceeded for a particular item, a variation order will be issued.
The following factors often contribute to an increase in the pricing :
- Thorough cleaning of woodlot.
- Rock problems on plot.
- Demolition of existing structures.
- Levelling of structure with plot.
- Temporary onsite power and water services.
- Masonry decorative elements.
- Heavy duty bars reinforcement and retaining walls.
- Roof types.
Please contact us for more info.
Do you offer a free storage container for materials during construction?
Yes, we may provide a free storage container for your materials, subject to availability and project requirements. Please contact us in advance to check availability and discuss your specific needs.
Does your company have in house architects and engineers?
We have long standing working relationships with many qualified architects and engineers. This allows us to select the firms with the best fit for the project needs.
How much is a Square Feet in Square Metre?
1 Sq. Ft. is equal to 0.092903 Sq. M.
We have all the right tools, let us Help You
We have all the right tools, let us Help You